First Day of Remodeling: Floor Preparation for Hardwood Click-Lock by EMILY RISE


Here we started! We made demolition of old hardwood floors (they were spoiled by water and many other things - they were just old and uneven) and bseboards together with ugly door with trims, we installed plywood underlayer and prepared the walls for baseboards (dry-wall restoration without patching - you will see this on next video). So, the old house from 1920-s will be renewed! Very soon!

INSTAGRAM: http://instagram.com/constructionphilly

TWITTER: https://twitter.com/emilyrisedesign

FACEBOOK: https://www.facebook.com/emilyrisedesign

PINTEREST: https://www.pinterest.com/emilyrisedesign/

YOUTUBE: https://www.youtube.com/channel/UCjLDUR8v9BIInAkknfNnXUA  

DESIGN CONSULTATION: https://design.emilyrise.com

CALL US: 1-215-531-2967

EMAIL TO: This email address is being protected from spambots. You need JavaScript enabled to view it.